Department of Transport, Public Works and Infrastructure
Vision
A properous people in a secure, healthy environment, with a high quality of life.
Mission
To harness the hardworking culture of the people of Nyeri and unlock their potential to achieve the highest standard of political, social and economic life by creating an enabling environment that promotes sustainable develoment.
Core values: Patriotism, Professionalism,Inclusivity, Teamwork, Integrity and Accountability
- Achieve connectivity and smooth flow of motorized and non-motorized traffic
- Maintenance of existing road network county wide
- Upgrading of existing roads to bitumen or gravel standards to make them al weather.
- Ensure all Public Works are correctly designed and with necessary approvals.
- Ensure adherence to construction codes and specifications through regular supervision and inspections
- Provide walkways for non- motorized traffic in our major urban centres
- Ensure establishment of a county roads fund
- Ensure establishment of a County Roads Board
This department deals with Installation of Culverts, Upgrading and Maintenance of County roads.
ITEM | FINANCIAL | GRADED LENGTH KM | GRAVELLED LENGTH KM | TOTAL COST | REMARKS |
1. | 2013-2014 | 230 | 230 | 243,790,680.00 | Work done in 28 Wards |
5 (Length) | 1.5 (Width) | 41,947,797.50 | 100% Complete in 3No. Wards | ||
2. | 2014 – 2015 | 252 | 252 | 305,944,318 | Work done in 27 wards |
3.
|
2015-2016
(i) 8Km Programme |
290.89 |
273.24 |
278,603,0.75.00 |
Work done in 30 Wards |
(ii) Ward Specific Roads Works |
103, 000,000 | – In 10 Wards works over 75% complete. – In 4 wards between50% and 75% complete- In 2 Wards below 50% – In 2 Wards at awarding |
|||
(iii) Installation of Culverts |
Kshs. 62,807,574.00 | – 100% complete in 25 wards
– 70% complete in 1No. ward – To commence in 4 Wards |
|||
(iv) Other upgrading road works |
63.76 | 63.76 | 106,010,276.30 | Work done in 13 Wards |
ITEM | FINANCIAL | GRADED LENGTH KM | GRAVELLED LENGTH KM | TOTAL COST | REMARKS |
(v) Installation of Culverts | Kshs. 62,807,574.00 | – 100% complete in 25 wards
– 70% in ward – To commence in 4 Wards |
|||
(vi) Vehicular and Foot Bridges(9No.) | 9No. Box Culverts | Kshs6,835,900.00 | 100% complete in 5 No. Wards | ||
4 | 2016 – 2017 (i) Affirmative 10 Km Project |
Kshs. 120,000,000.00
(Estimate) |
Work to be done in 8No. wards of Kieni | ||
(ii) 8Km Phase II | Kshs. 360,000,00.00
(Estimate) |
Work to be done in all 30 No. wards | |||
(iii) Other Upgrading Road works |
Kshs. 25,000,000.00 (Estimate) |
Works to be done in Gakawa and Mukurwe-ini | |||
(iv) Vehicular and Foot bridges | 6No. Box Culverts and 11No. Foot bridge | Kshs. 60,000,000.00
(Budget) |
5No. Bridges are on-going | ||
(v)Emergency works with department equipment |
150 |
29 |
Kshs. 50,000,000.00 (Projected cost) |
Work done using department equipments |
WARD SPECIFIC PROJECTS
INSTALLATION OF CULVERTS PROGRAMME
Directorate of Roads
Director |
Physical Location |
Mandate of the Directorate
Directorate of Transport
Directorate of Public Works
Director |
Physical Location |
Mandate of the Directorate