Department of Infrastructure Development

Vision
A properous people in a secure, healthy environment, with a high quality of life.

Mission
To harness the hardworking culture of the people of Nyeri and unlock their potential to achieve the highest standard of political, social and economic life by creating an enabling environment that promotes sustainable develoment.

Core values: Patriotism, Professionalism,Inclusivity, Teamwork, Integrity and Accountability

  • Achieve connectivity and smooth flow of motorized and non-motorized traffic
  • Maintenance of existing road network county wide
  • Upgrading of existing roads to bitumen or gravel standards to make them al weather.
  • Ensure all Public Works are correctly designed and with necessary approvals.
  • Ensure adherence to construction codes and specifications through regular supervision and inspections
  • Provide walkways for non- motorized traffic in our major urban centres
  • Ensure establishment of a county roads fund
  • Ensure establishment of a County Roads Board
ROAD WORKS

This department deals with Installation of Culverts, Upgrading and Maintenance of County roads.

ITEM FINANCIAL GRADED LENGTH KM GRAVELLED LENGTH KM TOTAL COST REMARKS
1. 2013-2014 230 230 243,790,680.00 Work done in 28 Wards
5 (Length) 1.5 (Width) 41,947,797.50 100% Complete in 3No. Wards
2. 2014 – 2015 252 252 305,944,318 Work done in 27 wards
3.

 

 

2015-2016

(i) 8Km Programme
Phase 1

 

 

290.89

 

 

273.24

 

 

278,603,0.75.00

 

 

Work done in 30 Wards

(ii) Ward Specific
Roads Works
103, 000,000 – In 10 Wards works over 75%
complete.
– In 4 wards between50% and 75%
complete- In 2 Wards below 50%
– In 2 Wards at awarding
(iii) Installation of
Culverts
Kshs. 62,807,574.00 – 100% complete in 25 wards

– 70% complete in 1No.  ward

– To commence in 4 Wards

(iv) Other
upgrading
road works
63.76 63.76 106,010,276.30 Work done in 13 Wards
ITEM FINANCIAL GRADED LENGTH KM GRAVELLED LENGTH KM TOTAL COST REMARKS
(v) Installation of Culverts Kshs. 62,807,574.00 – 100% complete in 25 wards

– 70% in ward

– To commence in 4 Wards

(vi) Vehicular and Foot Bridges(9No.) 9No. Box Culverts Kshs6,835,900.00 100% complete in 5 No. Wards
4 2016 – 2017
(i) Affirmative 10 Km Project
Kshs. 120,000,000.00

(Estimate)

Work to be done in 8No. wards of Kieni
(ii) 8Km Phase II Kshs. 360,000,00.00

(Estimate)

Work to be done in all 30 No. wards
(iii) Other Upgrading
Road works
Kshs. 25,000,000.00
(Estimate)
Works to be done in Gakawa and Mukurwe-ini
(iv) Vehicular and Foot bridges 6No. Box Culverts and 11No. Foot bridge Kshs. 60,000,000.00

(Budget)

5No. Bridges are on-going
(v)Emergency
works with
department
equipment
 

150

 

29

 

Kshs. 50,000,000.00

(Projected cost)

 

Work done using department equipments

ROADS WORKS

WARD SPECIFIC PROJECTS

INSTALLATION OF CULVERTS PROGRAMME

Chief Officer

Q.S.  J. K. Ringera

Directorate of Roads

Director

Physical Location

Mandate of the Directorate

Directorate of Public Works



Director

Physical Location

Mandate of the Directorate